You have arrived on the English website.

Networking of the Concorde-Rivoli cooling system

Networking of the Concorde-Rivoli cooling system
From April 2016 to April 2017
- Laying of 2 DN 500mm pre-insulated steel pipes (730 lm)

- Underground passage (40 lm dug by drilling - diameter 1.60m)

- Digging of 2 wells, depth 7m
call
Do you have a similar project?
Contact Darras & Jouanin.